Case Study: Building a Resilient IT Foundation for Eurofreight’s New Head Office
Client: Eurofreight
Industry: Freight & Logistics
Location: Ħal Far, Malta
Project: Office Relocation, Network Infrastructure & Multi-Site Connectivity
Project Timeline: January – May 2026
Technology Partner: InterTek Labs
A New Office. A Stronger IT Foundation.
When Eurofreight prepared to relocate its head office to new premises in Ħal Far, the move presented an opportunity to establish a new, resilient IT infrastructure designed to support its operations across multiple locations.
InterTek Labs was entrusted with managing the technical aspects of the relocation, from dismantling the existing office IT environment to consulting, designing, installing, configuring and rolling out the new network infrastructure.
The project also included connecting Eurofreight’s Bonds and Warehouse locations to its new head office, alongside implementing firewall high availability, network redundancy, wireless connectivity and server infrastructure.
With a fixed relocation date of 1 May 2026, careful planning, technical coordination and execution were essential.

The Challenge: Relocating IT While Preparing for the Future
An office relocation involves far more than moving computers and reconnecting cables.
For Eurofreight, the project required the transition of its existing technology environment while establishing a new network infrastructure at the Ħal Far premises.
The scope extended beyond the head office. The new environment needed to accommodate connectivity between three operational locations:
- Eurofreight’s new Head Office in Ħal Far
- The Bonds location
- The Warehouse
The project also required a high-availability firewall setup and network redundancy to strengthen infrastructure resilience.
Adding to the complexity was a firm relocation deadline of 1 May 2026. Our lead technical person associated with Eurofreight’s setup was also on maternity leave during the project, making effective coordination and communication particularly important.
InterTek Labs needed to manage the technical workstreams, coordinate the relocation and prepare the new environment within the agreed timeframe.
The Solution: A Connected, Resilient Network Across Three Locations
InterTek Labs delivered an end-to-end infrastructure project covering consultation, design, physical installation, configuration, deployment and testing.
1. Planning and Infrastructure Design
The engagement began with quotation and planning activities towards the middle of 2025.
InterTek Labs worked on the design of the new network environment, taking into account the head office requirements and the need to connect Eurofreight’s Bonds and Warehouse locations.
The proposed infrastructure incorporated switching, wireless access, firewall high availability, redundancy and server resources.
2. Structured Cabling and Network Deployment
Physical cabling works began in January 2026.
The project involved 130 network points, forming the structured cabling foundation for the new infrastructure.
The switching environment included:
- Three stacked network switches at the Head Office
- One network switch at the Bonds location
- One network switch at the Warehouse
Following installation, the physical cabling infrastructure was tested and certified.

3. Wireless Connectivity Across Locations
Wireless infrastructure was deployed across the three sites, comprising a total of 18 wireless access points:
- 7 at the Head Office
- 7 at Bonds
- 4 at the Warehouse
This deployment formed part of the wider network rollout supporting connectivity at Eurofreight’s locations.
4. Firewall High Availability and Network Redundancy
Resilience was an important element of the new network design.
InterTek Labs implemented a firewall high-availability configuration together with network redundancy provisions, including 3 internet connections as failover. This involved careful planning and discussions with key Internet Service Providers to explore different redundant solutions within the market.
The project also included a UPS installation to support the infrastructure’s power-protection requirements.


As part of commissioning, the team tested the firewall high-availability setup and the UPS installation.
5. Server Infrastructure and Workstation Relocation
The project included one physical server hosting four virtual machines.
InterTek Labs also managed the dismantling of technology at the previous office and the relocation activities involving approximately 50 workstations. This work formed part of the wider transition from the old office environment to the new premises.
6. Connecting the Three Locations
A key component of the project was establishing connectivity between Eurofreight’s new Head Office, Bonds location and Warehouse.
This brought the three locations into the scope of the new network environment and required coordination of the relevant network infrastructure and configurations.

The Implementation: From Preparation to Commissioning
The project was delivered through a series of planned stages.
End of 2025 – Initial Consultation and Quotations
Early engagement, quotations and planning for the new office infrastructure.
January 2026 – Cabling Works Begin
Commencement of physical cabling works in preparation for the new network environment.
January-April 2026 – Infrastructure Preparation
Network installation and preparation activities leading up to the scheduled relocation.
1 May 2026 – Office Relocation
Execution of the planned office move, including the transition of the existing technology environment.
End of May 2026 – Project Commissioning
Commissioning of the new infrastructure, including verification and testing activities.
Throughout the project, InterTek Labs coordinated the technical work required to progress towards the relocation and commissioning milestones.
One of the key successes of the project was the virtually uninterrupted transition to the new premises. Through careful planning and preparation, the IT infrastructure was installed, configured and tested well ahead of the physical move. The relocation itself was strategically scheduled for a Friday public holiday, minimising disruption to Eurofreight’s daily operations. As a result, when employees arrived at their new offices on Monday morning, all systems were fully operational, allowing business to resume seamlessly without any interruption to productivity.
The Project in Numbers
Infrastructure Component | Delivered Scope |
Connected business locations | 3 |
Network points | 130 |
Wireless access points | 18 |
Network switches | 5 |
Physical servers | 1 |
Virtual machines | 4 |
Workstations involved | 50 |
Firewall high availability | Implemented and tested |
UPS installation | Installed and tested |
Structured cabling | Tested and certified |
The Outcome: A New Infrastructure Foundation for Eurofreight
By the end of May 2026, InterTek Labs had commissioned the new network infrastructure associated with Eurofreight’s relocation.
The completed project included the new head office network, infrastructure across the Bonds and Warehouse locations, firewall high availability, redundancy provisions, wireless connectivity and server infrastructure.

The structured cabling installation was tested and certified, while the firewall high-availability configuration and UPS installation were also tested.
The project represents a significant infrastructure deployment spanning multiple business locations, delivered alongside the practical challenges of an office relocation and a fixed move date.
For InterTek Labs, it demonstrates the value of combining infrastructure planning, hands-on technical implementation, relocation coordination and commissioning within a single project.
More Than an Office Move
Technology infrastructure plays an important role when businesses relocate, expand or establish new operational premises.
The Eurofreight project highlights how a coordinated approach to IT planning and deployment can address multiple requirements at once, from structured cabling and wireless access to multi-site connectivity, infrastructure resilience and workstation relocation.
InterTek Labs is proud to have supported Eurofreight through this important transition and looks forward to continuing the relationship.